• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget

IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Networks
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Network Problem Report
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

Login to edit Whitelists/Blacklists on SPAM appliances (bc1/2) broken

February 8, 2008 by IRIS Staff

The login to the Spam appliances is currently broken. This is apparently due to a software upgrade. This problem has been reported to the vendor.

Users will be unable to add, remove or change their e-mail Whitelists/Blacklists.

This does not affect operation of any current e-mail Whitelists/Blacklists.
[Read more…] about Login to edit Whitelists/Blacklists on SPAM appliances (bc1/2) broken

Filed Under: Resolved Incidents Services: Spam Filtering

IRIS Website Offline Tonight for Server Migration

February 6, 2008 by IRIS Staff

The IRIS website will be offline for about 30 minutes this evening (Wed Feb 06) in order to redeploy parts of the site using the [Mongrel](http://mongrel.rubyforge.org) HTTP server.

Currently, the portions of the site written in Ruby are being served using fcgid, which isn’t the most stable option. The switch to Mongrel will bring more stability to the site and be faster to boot!
[Read more…] about IRIS Website Offline Tonight for Server Migration

Filed Under: Resolved Incidents Services: IRIS Website

Power Outage in 287 Soda– Restored

February 5, 2008 by IRIS Staff

There was a 10-minute power failure in 287 Soda at approximately 11:15. Power has been restored.

Filed Under: News

Matlab License Renewed (until 2/2/09)

February 1, 2008 by IRIS Staff

Due to a misunderstanding, IST thought that there was a 30 days grace period built into the license file, and so they thought the license file wouldn’t expire until 03/01/08. But as it turned out, that wasn’t true.

As a result, the matlab license server was down on 02/02/08 and 02/03/08.

The matlab license file has been renewed to 02/01/09.

We apologize for any inconvenience for the matlab downtime.

Resolved as of 2008-02-04 12:16:00

Filed Under: Resolved Incidents Services: Matlab Licensing

Switch malfunction in Cory first floor Mezzanine

January 30, 2008 by IRIS Staff

One of the smaller switches on the first floor of Cory serving mostly the first floor Mezzanine is having serious problems and I have attempted to reboot it. If this didn’t work I will be going down to manually reboot it.
[Read more…] about Switch malfunction in Cory first floor Mezzanine

Filed Under: Resolved Incidents Services: Wired Networking

Network switch error detected

January 29, 2008 by IRIS Staff

We have detected an error on the network switch that serves the EECS data center. While we are not currently detecting any impact on network performance, experience has shown that we will need to replace a 10Gig Ethernet blade in that switch. To minimize disruption, this board is now scheduled to be replaced between 07:00-07:30 tomorrow morning. If we detect any impact on service before then, the board will be replaced immediately without warning. We regret any inconveniences this may cause.

Filed Under: News

Mail delays due to last night’s power outage.

January 28, 2008 by IRIS Staff

As a result of last night’s power outage, there were some mail delays (and some senders may have received 4-hour notices). Obviously mail has been queued up on the external (and some internal) systems, which caused a spike after the services have been restored. As of now there are still some delays, but things are getting better.

One of the spam appliances had an internal failure last night, which caused it to not be able to properly scan email and deliver it. As a result, there were about 54K messages queued up. It is currently going through the queue and delivering those messages.
[Read more…] about Mail delays due to last night’s power outage.

Filed Under: Resolved Incidents Services: IMAP Server

EECS Network Outage

January 27, 2008 by IRIS Staff

From some time late last night until about 11:30 this morning, much of the EECS network was down due to a major power failure in the Soda Hall Network Center.

Two circuit breakers feeding both the power distribution system and the A/C tripped causing the outage. IDSG staff responded to the outage as did a UCB electrician who were able to restore power The electrician is investigating the cause but we don’t yet know what the cause was.

Thanks to many EECS staff who helped during this outage to get things going again.

Fred Archibald

Resolved as of 2008-01-27 11:00:00

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Airbears and AirbearsBeyond Disruption

January 25, 2008 by IRIS Staff

The “AirBears” and “AirBearsBeyond” wireless networks were unexpectedly offline from approximately 5:45p.m. to 10:00p.m. on Thursday, Jan 24.

There was an issue with the access manager and clients could not get DHCP leases. We are still investigating with [IST](http://ist.berkeley.edu) to determine the cause of the outage.

Filed Under: News

Rhea and Cronus

January 17, 2008 by IRIS Staff

This morning, during a network maintenance operation, there was an issue with a pair of redundant fibers that lost link and caused some issues in Rhea and Cronus. Service has been restored and we regret any inconvenience.

Filed Under: News

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 153
  • Go to page 154
  • Go to page 155
  • Go to page 156
  • Go to page 157
  • Interim pages omitted …
  • Go to page 190
  • Go to Next Page »

Primary Sidebar

IRIS Service Status

Green
We have 0 Active Incidents, and 0 Scheduled Maintenances noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.