Campus Facilities Services is scheduled to perform an urgent repair, replacing the main circuit breaker serving Cory Hall’s 188 Lab and 1st floor Mezzanine. An email from Logan Baldini, our Director of Facilities and Capital Projects, already went out on April 8 to Cory Hall occupants.
Work will take place Thursday, April 16, 8:15pm — 11:15pm. Power will be shut down for most of the south and west side of Cory Hall, including stairwells. Detailed room breakdown is available via Google Doc, attached to the email sent out by Logan.
We do not expect to lose power to our network switches and routers in Cory Hall during this work. If we do have unexpected power loss to our network equipment, then access to services hosted in Cory Hall (e.g. any research or instructional servers in 165 Cory) will be affected; we will monitor our equipment, but would expect service to resume once the electrical work is completed.
UPDATE
[2026-04-14 | larsrohr ]
This work has been postponed by Campus Facilities Services. We will update or re-post when we have an revised schedule to report.