• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget

IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Networks
    • Networks Home
    • Campus Wi-Fi
    • EECS Wired Networks
    • Campus Wired Networks
    • FAQ: Network
    • VPN
    • EECS Border Firewall
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

Computing Support during the 2011 Winter Break

December 15, 2011 by Rob McNicholas

Due to the Winter Holiday, Energy Curtailment, and New Year’s Holidays, the Berkeley campus is officially closed for the period Monday, December 26 to Friday, Dec 31, reopening on Monday, January 2, 2012.

All departmental computing servers will remain on and should be available during the break, but there will be no staff on site to provide any computing support or handle any requests. Automatic monitoring systems will alert staff to critical infrastructure problems, and any such problems will be dealt with on a best-effort basis. IRIS staff will be taking advantage of the holiday to do maintenance on some systems which will result in scattered outages, but any such downtime will be separately announced and posted on the IRIS website.

The IRIS Helpdesk will be closed beginning December 23 at 12:00 noon, and will reopen on January 2. Problem reports can be left on the Helpdesk voice mail (2-7777) or emailed to help@eecs, but staff may not receive or reply to these messages until January 2.

Requests for new IRIS accounts that are received after Dec 16 will be processed on January 2, 2012.

During the break, Instructional labs will be locked, but the main servers will remain online (imail.eecs, inst.eecs, cory.eecs, mamba.eecs and fileservice.eecs). Instructional support staff will occasionally monitor inst@eecs over the break. If you are unable to contact inst@eecs, you can leave a message at 643-6141. Please be aware, though, that staff may not be able to respond or reply to messages until January 2.

We recommend that all desktop computers be shutdown during the Energy Curtailment Period. If your Windows computer needs to stay on during the break, we recommend that you check with your system administrator to ensure that Automatic Updates are enabled with the option “Automatically download the updates and install them on the schedule that I specify” with a daily update schedule.

Computing support staff will be monitoring their email when possible, so please use standard email addresses to report any urgent problems. As a reminder:

* Instructional Computing Environment: inst@eecs
* Research / Staff Computing Environment: help@eecs

Enjoy your holiday break!

Filed Under: News

EECS-Secure invalid certificate

December 14, 2011 by Eric Fraser

Logging into the EECS-Secure wireless results in a invalid certificate. Staff are aware of this issue and are currently working to resolve it.
[Read more…] about EECS-Secure invalid certificate

Filed Under: Resolved Incidents Services: Wireless Networking

Dec 2011 Server Patching

December 13, 2011 by IRIS Staff

Microsoft will release their patches for the month on Tuesday, December 13th, 2011.

PRINT, WDS and WINTERM will automatically patch and reboot Wednesday, December 14th, at 3:00 am.



WINTERM will be unavailable till 10:00am December 14th.

Resolved as of 2011-12-15 09:41:00

Filed Under: Resolved Incidents Services: Print Server, WDS, winterm.eecs

new SSL certificate installed on gateway.eecs

December 6, 2011 by Mark Kraitchman

The installed SSL certificate was scheduled to expire 2011/12/31.

A new SSL certificate was installed on the authenticated outgoing smtp server gateway.EECS.Berkeley.EDU. This SSL certificate will expire 10/21/2013

Resolved as of 2011-12-06 09:41:00

Filed Under: Resolved Incidents Services: SMTP Server

Mathematica license service is down

December 1, 2011 by Lars Rohrbach

The EECS Mathematica license service is currently unavailable. Staff are investigating.
[Read more…] about Mathematica license service is down

Filed Under: Resolved Incidents Services: Mathematica Licensing

Thanksgiving CalMail Outage

November 25, 2011 by Lars Rohrbach

A hardware outage at CalMail will delay email delivery, perhaps for most of this Thanksgiving weekend. Please see http://ucbsystems.org/ for further information and updates.
[Read more…] about Thanksgiving CalMail Outage

Filed Under: Resolved Incidents Services: IMAP Server

Performance problems with project storage

November 18, 2011 by Rob McNicholas

We have had various reports of slow access times and “out of space” errors when trying to read or write files on project storage. Staff are currently investigating the problem.

If you are experiencing problems, please send the following details to help@eecs:

– name / IP address of client having problems
– description of problem or error message
– type of access -NFS or CIFS?
– name of share you are trying to access

Updates will be posted to this article when we know more.
[Read more…] about Performance problems with project storage

Filed Under: Resolved Incidents Services: Project Storage

Nov 2011 Server Patching

November 8, 2011 by IRIS Staff

Microsoft will release their patches for the month on Tuesday, Nov 8th, 2011.

PRINT, WDS and WINTERM will automatically patch and reboot Wednesday, Nov 9th, at 3:00 am.

WINTERM will be unavailable till 10:00am Nov 9th.

Resolved as of 2011-11-09 10:59:00

Filed Under: Resolved Incidents Services: Print Server, WDS, winterm.eecs

Unscheduled network outage at BWRC

November 1, 2011 by IRIS Staff

The router connecting the BWRC to the rest of the EECS network is down. We are investigating the problem.
[Read more…] about Unscheduled network outage at BWRC

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Unscheduled Outage CalMail

October 25, 2011 by Eric Fraser

http://ucbsystems.org/2011/10/28/unscheduled-outage-calmail-6/
[Read more…] about Unscheduled Outage CalMail

Filed Under: Resolved Incidents Services: IMAP Server

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 113
  • Go to page 114
  • Go to page 115
  • Go to page 116
  • Go to page 117
  • Interim pages omitted …
  • Go to page 194
  • Go to Next Page »

Primary Sidebar

IRIS Service Status

Yellow
We have 0 Active Incidents, and 1 Scheduled Maintenance noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.
  • About
  • Contact
  • Privacy
  • Accessibility
  • Nondiscrimination

© 2022–2026 UC Regents  |  Log in