• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget
IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Networks
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

Derek Calderon

Switch failure on SDH 4th Floor

August 10, 2014 by Derek Calderon

Early on Sunday morning, there was a switch failure in the Nanofabrication Laboratory in Sutardja Dai Hall which has resulted in a partial loss of wired connectivity in the Nanolab. Network staff will be arriving shortly with a replacement switch and restoration of full connectivity is expected by 1PM.
[Read more…] about Switch failure on SDH 4th Floor

Filed Under: Resolved Incidents Services: Wired Networking

UPS Maintenance in SDH 158

August 6, 2014 by Derek Calderon

At 11 AM today we will be replacing batteries and performing maintenance on a faulty UPS located in our primary server and network room for Sutardja Dai Hall. No service interruptions are expected. However, in the event of a failure, there may be a ~5 minute loss of wired and wireless networking in Sutardja Dai Hall, as well as a loss of the NetApp network file storage for the EECS Instructional Labs. The maintenance is expected to last for approximately one hour, but two have been allotted in case of complication.
[Read more…] about UPS Maintenance in SDH 158

Filed Under: Resolved Incidents Services: Project Storage, Wired Networking, Wireless Networking

Cory Hall 5th Floor Switch Failure

July 18, 2014 by Derek Calderon

On Friday night, we experienced a failure of an access switch on the 5th floor of Cory Hall. This has resulted in a loss of connectivity to approximately one third of the wired devices and wireless access points on the floor. We are currently in the process of replacing the switch and should restore full connectivity by 12:30 PM.
[Read more…] about Cory Hall 5th Floor Switch Failure

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Intermittent Network Slowness Today

July 14, 2014 by Derek Calderon

We are performing firewall load testing today, to help prevent additional incidents as we have seen in the last couple weeks. There will be intermittent moments of poor network performance at the EECS border as this occurs. We are watching closely to insure the interruptions are as few and as brief as possible.
[Read more…] about Intermittent Network Slowness Today

Filed Under: Resolved Incidents Services: Wired Networking

EECS Network Scheduled Outage on Mar. 29 2014

March 29, 2014 by Derek Calderon

We will be having a large scheduled outage of the EECS network in order to physically relocate some core devices as Phase Three of a project to overhaul the EECS network core. This maintenance will occur between 10AM and 6PM on Saturday, March 29, 2014. We do not anticipate the outage to last for the full eight hours, but extra time has been allotted in case of complications.

Expected impacts of this outage include:

– Internet connectivity to all EECS Wired buildings* will be offline
– Soda Hall wired and wireless networking will be entirely offline
– BWRC will be isolated from EECS and unable to access the Internet or EECS network resources
– Wireless networking in EECS Airspace** will be unavailable (the networks will continue to be visible in some locations, however the underlying network services will be offline)
– EECS Wired buildings other than Soda Hall and BWRC should retain connectivity and access to EECS network resources (filers, AD, etc.), but to reiterate, the Internet connection will be unavailable.

We apologize for any inconvenience that this maintenance will cause. For any questions or concerns about the maintenance, please email networks@eecs.berkeley.edu.

Thank you, IRIS Network Group

*EECS Wired buildings are Soda, Cory, and Sutardja Dai Halls, and the BWRC

**EECS Airspace includes Soda, Cory, Sutardja Dai, Calvin, and Blum Halls, as well as the Sibley Auditorium, Hearst Memorial Mining Building, and BWRC
[Read more…] about EECS Network Scheduled Outage on Mar. 29 2014

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

EECS Network Scheduled Outage on Jan. 11 2014

January 11, 2014 by Derek Calderon

We will be having a large scheduled outage of the EECS network in order to physically relocate some core devices as Phase One of a project to overhaul the EECS network core. This maintenance will occur between 10AM and 6PM on Saturday, January 11, 2014. We do not anticipate the downtime to last for the full eight hours, but extra time has been allotted in case of complications.

Expected impacts of this outage include:

  • Internet connectivity to all EECS Wired buildings* will be offline
  • Soda Hall wired and wireless networking will be entirely offline
  • BWRC will be isolated from EECS and unable to access the Internet or EECS network resources
  • Wireless networking in EECS Airspace** will be unavailable (the networks will continue to be visible in some locations, however the underlying network services will be offline)

EECS Wired buildings other than Soda Hall and BWRC should retain connectivity and access to EECS network resources (filers, AD, etc.), but to reiterate, the Internet connection will be unavailable.

We apologize for any inconvenience that this maintenance will cause. For any questions or concerns about the maintenance, please email networks@eecs.berkeley.edu.

Thank you,
IRIS IDSG Network Group

*EECS Wired buildings are Soda, Cory, and Sutardja Dai Halls, and the BWRC

**EECS Airspace includes Soda, Cory, Sutardja Dai, Calvin, and Blum Halls, as well as the Sibley Auditorium, Hearst Memorial Mining Building, and BWRC
[Read more…] about EECS Network Scheduled Outage on Jan. 11 2014

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Scheduled network outage at BWRC on Dec. 11

December 11, 2013 by Derek Calderon

Between 8 and 9 AM on December 11th, IRIS and BWRC staff will be performing scheduled maintenance to expand the BWRC server network from a /26 to a /25. The BWRC network and associated services will be down during this time, and clients onsite at BWRC will be unable to reach the IRIS and campus networks.
[Read more…] about Scheduled network outage at BWRC on Dec. 11

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Brief Service Outage for AirBears and attwifi in EECS

December 5, 2013 by Derek Calderon

Campus IST staff will be performing scheduled maintenance on the switches which service AirBears, AirBears 2, and attwifi on the EECS wireless network*. IST expects that this maintenance will cause a brief service interruption for these networks between 6-7AM on this Thursday, December 5th. For up to date information, please visit ucbsystems.org or contact the IST Service Center.

Thanks,
IRIS IDSG Network Group

*The EECS wireless network includes Soda, Cory, Sutardja Dai, Calvin, and Blum Halls, as well as the Sibley Auditorium, Hearst Memorial Mining Building, and BWRC.
[Read more…] about Brief Service Outage for AirBears and attwifi in EECS

Filed Under: Resolved Incidents Services: Wireless Networking

Network outage in NanoLab

December 4, 2013 by Derek Calderon

The switch in slot 2 of citsum6M81 in the NanoLab on the 6th floor of Sutardja Dai Hall has failed. As a result, some wired networking services on the 5th and 6th floors are likely impaired. Network staff are currently preparing a replacement switch and intend to have the outage resolved early this evening. We apologize for any inconvenience caused by this outage.
[Read more…] about Network outage in NanoLab

Filed Under: Resolved Incidents Services: Wired Networking

EECS Network in a degraded state

December 3, 2013 by Derek Calderon

The EECS network is currently running in a degraded state due to an unknown issue. You may notice slowness or difficulty reaching some sites or services. Network staff are coming onsite and will post an update once more information is available.
[Read more…] about EECS Network in a degraded state

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 20
  • Go to page 21
  • Go to page 22
  • Go to page 23
  • Go to Next Page »

Primary Sidebar

IRIS Service Status

Green
We have 0 Active Incidents, and 0 Scheduled Maintenances noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.
  • About
  • Contact
  • Privacy
  • Accessibility
  • Nondiscrimination

© 2022–2026 UC Regents  |  Log in