• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget
IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Networks
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

Wireless Networking

Wireless network service

Soda Wireless Network outage on May 25 at 8:00AM

May 25, 2010 by Janet Shu

Soda Wireless AP controller will be upgraded with the newer version of firmware on May 25(Tuesday) at 8:00AM.

I will reboot Soda AP controller. I will schedule the wireless network downtime for about 20 mins. You may experience that the wireless network will be down for about 20 mins during 8:00AM-8:20AM. This upgrade will not affect wireless users in Cory,Citris or BWRC. During this time, the wired network will still work.

If you have questions, please contact with networks@eecs

Resolved as of 2010-05-25 08:20:00

Filed Under: Resolved Incidents Services: Wireless Networking

BWRC Wireless Network outage on May 24 at 10:00AM

May 24, 2010 by Janet Shu

BWRC Wireless AP controller will be upgraded with the newer version of firmware on May 24 (Monday) at 10:00AM.

I will reboot BWRC AP controller. I will schedule the wireless network downtime for about 20 mins. You may experience that the wireless network will be down for about 20 mins during 10:00AM-10:30AM. This upgrade will not affect wireless users in Soda, Cory and Citris. During this time, the wired network will still work.

If you have questions, please contact with networks@eecs

Resolved as of 2010-05-24 10:21:00

Filed Under: Resolved Incidents Services: Wireless Networking

EECS wireless RADIUS patching

May 13, 2010 by Janet Shu

On Thursday, May 13 from 9:00 to 10:00PM, there will be a patch to be applied for EECS department RADIUS server. This patch will fix a few issues in configuration replication between the Cluster nodes. Public facing services which depend on RADIUS are EECS-Secure, EECS-Open, and EECS-Guest authentication and accounting. We do not expect this work will cause an outage for these services, as the second, redundant server will remain operational during this time and should not be affected by this work. A one hour outage window has been scheduled in the event of unexpected problems.

Please contact with help@eecs or networks@eecs if you have any question.





Resolved as of 2010-05-13 21:40:00

Filed Under: Resolved Incidents Services: Wireless Networking

BWRC wireless problem

May 11, 2010 by Mark Kraitchman

The dhcp server for the IRIS wireless networks
at BWRC is down. Clients are not
able to get a new dhcp lease or renew their
lease.

Staff is working to resolve this problem.
[Read more…] about BWRC wireless problem

Filed Under: Resolved Incidents Services: Wireless Networking

Wireless at BWRC

May 10, 2010 by Janet Shu

You can use AirBears instead.
[Read more…] about Wireless at BWRC

Filed Under: Resolved Incidents Services: DHCP, Wireless Networking

EECS/AirBears Wireless Network outage 9:00PM on May 6

May 6, 2010 by Janet Shu

We would like to upgrade to the latest release of HMOL, 3.4r3 for some APs at Euclid Brewed Awakening coffee shop area. The latest HMOL release has many new and exciting features, including IPSec VPN access, Performance Sentinel, and improved client statistics. This upgrade should take less than half a hour.

Resolved as of 2010-05-06 21:23:00

Filed Under: Resolved Incidents Services: Wireless Networking

6th floor Soda switch replacment

April 29, 2010 by IRIS Staff

Due to a power supply failure, I will be replacing one of the stacked switches which serves the 6th Floor of Soda Hall. The switch is currently operating only on an external redundant power supply.

The outage will definitely affect half of the connections on the 6th floor for about 20 minutes; if a full stack reboot is required (likely) the rest of the 6th floor connections, including wireless, will be briefly disrupted.

Resolved as of 2010-04-29 07:40:00

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Services Impacted by Cory Power Outage

March 22, 2010 by Lars Rohrbach

As previously announced via email, Cory Hall is scheduled for a power outage on March 22nd:

> Cory Hall Occupants,
>
> In order to perform maintenance on the main Cory Hall power
> transformers, Campus Physical Plant has scheduled a building-wide power
> shutdown during spring break on Monday, 3-22-10. The power to the
> building will be shutdown from 8am-8pm.
>
> For safety reasons, building Access will be prohibited (cardkey system
> disabled) from 11:50pm Sunday, 3-21-10 to 8pm Monday, 3-22-10.
>
> In preparation for the shutdown, please be sure to power off and unplug
> all electrical equipment in your workspace prior to leaving for Spring
> Break. (Electrical equipment includes computers, monitors, heaters &
> fans. Unplug power strips!).
>
> Please also remember to remove food items from refrigerators prior to
> leaving for Spring Break.
>
> Finally, make sure all doors are locked and windows are closed.

This outage will affect various servers in Cory Hall, including the EECS Exchange servers FONTUS and OWA; some Instructional servers (see http://inst.eecs.berkeley.edu/notices.html#spring-break); and license service for Cadence and Synopsys licenses.

All Cory Hall networking will be down during the power outage.

Exchange service should be restored by late Monday evening, after power is restored. All remaining services should be back online by midday Tuesday.

[Read more…] about Services Impacted by Cory Power Outage

Filed Under: Resolved Incidents Services: Cadence Licensing, EECS Exchange Service, Wired Networking, Wireless Networking

Issue with Wireless Authentication

March 10, 2010 by IRIS Staff

We are currently seeing an issue with some clients authenticating to EECS-Secure. There appears to be a compatibility issues with Active Directory 2008 R2 and our RADIUS server. We have contacted the vendor and they are aware of the issue and are preparing a patch. We hope to have a fix soon.
[Read more…] about Issue with Wireless Authentication

Filed Under: Resolved Incidents Services: Wireless Networking

New AirBears deployment in EECS

March 3, 2010 by Janet Shu

A new AirBears deployment for Cory, Soda, remaining parts of Hearst Mining, Sutardja Dai, and 2108 Allston Way (BWRC) is scheduled for Wednesday, March 3rd between 06:00AM and 08:00AM.

During this outage we will be working with IST to install the new captive portal for EECS. The AirBears network will be intermittently unavailable during this work.

For the information on the new AirBears captive portal, please see the following URL. http://ls.berkeley.edu/mail/micronet/2009/0678.html

If you have any questions or concerns, please contact help@eecs.

Resolved as of 2010-03-03 06:29:00

Filed Under: Resolved Incidents Services: Wireless Networking

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 24
  • Go to page 25
  • Go to page 26
  • Go to page 27
  • Go to page 28
  • Interim pages omitted …
  • Go to page 31
  • Go to Next Page »

Primary Sidebar

IRIS Service Status

Green
We have 0 Active Incidents, and 0 Scheduled Maintenances noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.
  • About
  • Contact
  • Privacy
  • Accessibility
  • Nondiscrimination

© 2022–2026 UC Regents  |  Log in