• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget
IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Network
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Network Problem Report
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

Services Impacted by Cory Power Outage

March 22, 2010 by Lars Rohrbach

As previously announced via email, Cory Hall is scheduled for a power outage on March 22nd:

> Cory Hall Occupants, > > In order to perform maintenance on the main Cory Hall power > transformers, Campus Physical Plant has scheduled a building-wide power > shutdown during spring break on Monday, 3-22-10. The power to the > building will be shutdown from 8am-8pm. > > For safety reasons, building Access will be prohibited (cardkey system > disabled) from 11:50pm Sunday, 3-21-10 to 8pm Monday, 3-22-10. > > In preparation for the shutdown, please be sure to power off and unplug > all electrical equipment in your workspace prior to leaving for Spring > Break. (Electrical equipment includes computers, monitors, heaters & > fans. Unplug power strips!). > > Please also remember to remove food items from refrigerators prior to > leaving for Spring Break. > > Finally, make sure all doors are locked and windows are closed.

This outage will affect various servers in Cory Hall, including the EECS Exchange servers FONTUS and OWA; some Instructional servers (see http://inst.eecs.berkeley.edu/notices.html#spring-break); and license service for Cadence and Synopsys licenses.

All Cory Hall networking will be down during the power outage.

Exchange service should be restored by late Monday evening, after power is restored. All remaining services should be back online by midday Tuesday.


UPDATE

[2010-03-22 22:59:13 | Lars Rohrbach]

Power was restored to Cory Hall at approximately 7:00 pm, and network equipment was brought back online soon afterward. Production services, including EECS Exchange service, Cadence/Synopsys licensing, and Instructional servers, were all generally available by 8:30 pm.

Resolved as of 2010-03-22 20:30:00

Filed Under: Resolved Incidents Services: Cadence Licensing, EECS Exchange Service, Wired Networking, Wireless Networking

Primary Sidebar

IRIS Service Status

Green
We have 0 Active Incidents, and 0 Scheduled Maintenances noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.
  • About
  • Contact
  • Privacy
  • Accessibility
  • Nondiscrimination

© 2022–2025 UC Regents  |  Log in