Starting around 11:20PM tonight, both of the EECS department websites, http://www.cs.berkeley.edu/ and http://www.eecs.berkeley.edu/, became unreachable. Staff are looking into the problem, but no known cause is apparent at this time.
[Read more…] about EECS Department Websites down
AirBears2 in EECS
We will begin broadcasting the AirBears2 Wi-Fi network in EECS airspace* before the start of the fall semester. Please stay tuned for further details, and feel free to e-mail help@eecs.berkeley.edu with questions or concerns.
Thank you,
IRIS IDSG Network Group
*EECS airspace includes Soda, Cory, Sutardja Dai, Calvin, and Blum Halls, as well as the Sibley Auditorium, Hearst Memorial Mining Building, and BWRC.
[Read more…] about AirBears2 in EECS
login.eecs downtime Tuesday July 30, 2013
login.EECS.Berkeley.EDU will be down for patching and needed reboot to activate changes delivered by some Oracle patches.
Though the scheduled downtime is 6:30am to 8am, we expect actual downtime to be less.
[Read more…] about login.eecs downtime Tuesday July 30, 2013
July 17th SDH Power Shutdown 7am-10am (Will affect cluster.eecs and instfs.eecs)
On Wednesday July 17th from 7am to 10am the Campus Fire Marshall and Physical Plant Campus Services (PPCS) will perform an emergency generator test simulating loss of normal power to the building. During this test all normal power to Sutardja Dai Hall will be off. The main impact on IRIS infrastructure services will be a shutdown of the cluster.eecs and instfs.eecs fileservers.
[Read more…] about July 17th SDH Power Shutdown 7am-10am (Will affect cluster.eecs and instfs.eecs)
LDAP server upgrade
[IRIS](https://iris.eecs.berkeley.edu) is embarking on a project to upgrade the department’s LDAP infrastructure (ldap.eecs and ldap.cs) before the summer is over. The current server software is a proprietary product that is at the end of its lifetime. We are migrating to an open-source product that is in wide use, [OpenLDAP](http://www.openldap.org/).
Our goal is for this transition to be largely transparent. Basic functionality such as mail client address book look-ups and anonymous binds will be thoroughly tested, and our goal is that most people won’t notice when we make the switch.
However, if you are an application developer or system administrator that accesses our directory programmatically, we would like to invite you to participate in our testing phase to ensure your applications or scripts will still work with the new server.
If you would like to participate in this testing, or just monitor the progress of the project, please subscribe to the mailing list ldap-migration@lists.eecs.berkeley.edu by [sending an email to sympa@lists.eecs.berkeley.edu with the body “subscribe ldap-migration”](mailto:sympa@lists.eecs.berkeley.edu?body=subscribe%20ldap-migration).
All further discussion of this project will take place on that mailing list. A detailed and technical project plan will be posted there early next week.
Please send any questions to the IRIS helpdesk at help@eecs.berkeley.edu
Thanks,
-Rob
login.eecs downtime Wednesday July 10, 2013
login.EECS.Berkeley.EDU will be down for patching and needed reboot to activate changes delivered by some Oracle patches.
Though the scheduled downtime is 6:30am to 8am, we expect actual downtime to be less.
[Read more…] about login.eecs downtime Wednesday July 10, 2013
July 2013 Server Patching
PRINT and WINTERM will automatically patch and reboot Wednesday, July 10th, at 3:00 am.
Resolved as of 2013-07-18 15:21:00
Upcoming Wifi Improvements
Dear EECS Community,
Over the past few months IDSG has invested significant amounts of time reviewing and analyzing the feedback provided to us, via multiple channels, by the EECS community. Among these channels were the IRIS survey, network trouble tickets and help desk reports. The most commonly received piece of feedback regarded the general lack of reliability and performance in the wireless services currently offered by the college.
After carefully inspecting the situation and attempting to determine the root cause of this issue it has been found that the single most significant contributor to this problem is the proliferation of rogue wireless devices. These devices not only decrease the reliability of the EECS network as a whole, but also exacerbate a number of smaller issues inherent to the very nature of wireless communications.
In order to adequately confront this threat and provide our community with the expected level of wireless service, we will begin active mitigation of unapproved wireless devices found to be broadcasting in [IRIS airspace](https://iris.eecs.berkeley.edu/15-faq/21-network/20-wireless.html#coverage) beginning on Thursday, June 27th. These actions will only apply to devices that provide wireless service such as access points and wireless routers. All other devices (including phones, tablets, and PDAs) will be entirely unaffected by this change. This action will be performed automatically and without prejudice as per our wireless vendor’s best practices.
As always we are open to feedback from the community and welcome the reporting of any and all issues at help@eecs.berkeley.edu.
Thank you,
IDSG Networking Team
[Read more…] about Upcoming Wifi Improvements
ATT Cellular Coverage Improvement
A new ATT cell has been added to the top of Etcheverry Hall. You should see a dramatic improvement of signal strength throughout the Northwest corner of campus. It is still being tuned so there could be brief outages in the next few weeks.
Some additional details at:
http://ist.berkeley.edu/att/cellular-coverage-improvement
EECS Switching Upgrade
EECS Community,
In preparation for the upcoming opening of Calvin Hall, IDSG will be making a number of small modifications to the switching core of the EECS network tomorrow, Friday the 21st, between 8:00 AM and 11:00 AM. These changes are not expected to have any user facing impacts but changes of this nature always carry with them an inherent risk.
As always please report any issues you experience to help@eecs.berkeley.edu.
Thank you,
IDSG Networking Team
[Read more…] about EECS Switching Upgrade