• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget
IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Network
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Network Problem Report
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

IRIS Staff

winterm network failure

February 13, 2013 by IRIS Staff

Due to unforeseen load on the network, a switch has failed in 290. Supported hosts include winterm.eecs. Support for winterm.eecs should resume in 30 minutes.
[Read more…] about winterm network failure

Filed Under: Resolved Incidents Services: Department Webservice, IRIS Website, Jabber, Mailing Lists, winterm.eecs

Feb 2013 Server Patching

February 13, 2013 by IRIS Staff

Microsoft will release their patches for the month on Tuesday, February 13th, 2013.

PRINT, WDS and WINTERM will automatically patch and reboot Wednesday, February 14th, at 3:00 am.

WINTERM will be unavailable till 10:00am Wednesday, February 14th.
[Read more…] about Feb 2013 Server Patching

Filed Under: Resolved Incidents Services: Print Server, WDS, winterm.eecs

winterm.eecs down for rebuild

February 6, 2013 by IRIS Staff

winterm.eecs is being rebuilt. We are working this evening and early tomorrow to have the new instance up as soon as possible. We will give you further information tomorrow.
[Read more…] about winterm.eecs down for rebuild

Filed Under: Resolved Incidents Services: winterm.eecs

wds.eecs down

January 29, 2013 by IRIS Staff

wds.eecs.berkeley.edu will be down until further notice while IDSG reevaluates our current and future automated deployment offerings.
[Read more…] about wds.eecs down

Filed Under: Resolved Incidents Services: WDS

Onsite Maintenance of cluster.eecs

January 25, 2013 by IRIS Staff

A Netapp engineer will be onsite performing maintenance of cluster.eecs on Jan. 25th at 1:00pm. The inst-fs and cluster filers are expected to failover to vault1 during the maintenance, and no loss of service is anticipated.

Resolved as of 2013-01-25 16:47:00

Filed Under: Resolved Incidents Services: Project Storage

AirBears maintenance and upgrade Jan 18th 6am-7am

January 18, 2013 by IRIS Staff

Equipment: cit2fes, sut1rs, sut11fes, Citris8810

Location: Sutardja Dai Hall, Blum Hall, Soda Hall, Cory Hall, Hearst Mining

Date: January 18th, 2013 Start: 06:00 am End: 07:00 am

Description: The “AirBears” network in Sutardja Dai, Blum Hall, Soda Hall, Cory Hall, and parts of Heart Mining will be interrupted during this outage. This outage is to move connections in Sutardja Dai to more modern switches. The EECS wireless networks in these buildings will remain in normal operation.

Connections on the 2 PPCS subnets below will be interrupted in Sutardja Dai (CITRIS), Soda Hall and Blum Hall. 128.32.211.0/27 , Evans zone PPCS user net, PPCS 10.129.128.0/25 , Evans zone PPCS 1918 net, PPCS

Five data connections on the Sutardja Dai Zone Cobalt net, 10.254.244.0/24 , will be affected. These 5 data lines are all in room 171 Sutardja Dai.

Questions regarding this outage can be directed to:

Brendan Kelly, Telecommunications 664-4605 bkelly@b.e

Janet Shu, IDSG 643-5112 networks@eecs

Resolved as of 2013-01-18 06:21:00

Filed Under: Resolved Incidents Services: Wireless Networking

Winterm.eecs license deactivated

January 17, 2013 by IRIS Staff

The license on the department Windows Terminal Server winterm.eecs unexpectedly became deactivated Thursday night. Staff are investigating and expect to resolve the issue next week.

Resolved as of 2013-02-12 14:47:00

Filed Under: Resolved Incidents Services: winterm.eecs

Unexpected network flood

January 8, 2013 by IRIS Staff

There was an unexpected impact to the wired and wireless networks at approximately 4pm causing significant packet loss. IRIS staff has isolated the problem and is in the process of restoring impacted services. A configuration change by IT staff to the network was the enabler that allowed hosts from the server room to flood the network.

Resolved as of 2013-01-08 18:00:00

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Jan 2013 Server Patching

January 8, 2013 by IRIS Staff

Microsoft will release their patches for the month on Tuesday, January 8th, 2013.

PRINT, WDS and WINTERM will automatically patch and reboot Wednesday, January 9th, 2013, at 3:00 am.

WINTERM will be unavailable till 10:00am January 9th, 2013.
[Read more…] about Jan 2013 Server Patching

Filed Under: Resolved Incidents Services: Print Server, WDS, winterm.eecs

Schedule network maintenance during 2012 curtailment starting Dec 26th

December 26, 2012 by IRIS Staff

We will perform network maintenance with expected brief outages on
Wednesday, December 26th. The changes and scheduled times are listed
below, however the times and durations are subject to change. When the
maintenance is complete we will post an update on IRIS News afterwards
will monitor email to help@eecs for network problem reports.

10am-11am, Cory Hall 2nd floor wired network migration
======================================================
Any activated port cables id that have not migrated from the 47 subnet
by Wednesday December 26, 2012 will be migrated then. Further
information is available at:
https://iris.eecs.berkeley.edu/news/7853-second-floor-cory-hall-iris

11am-12pm, BWRC campus link switched from Comcast to AT&T
=========================================================
The circuit that connects the Berkeley Wireless Reserach Center (BWRC)
will be switched from the current 100Mb Comcast link to a 1Gb AT&T
link. We expect the downtime will take less than 5 minutes, but have
scheduled an hour maintenance window for testing puroses and
unexpected problems (in the event of which we can switch back to the
Comcast link).

12pm-3pm, Firmware upgrade for EECS Wireless network
====================================================
New firmware will be applied to the EECS wireless network devices.
This will require a rolling reboot across all four wireless
controllers. You may experience wireless outages during this time,
however the wired network will be available.

Please report the issues to networks@eecs if you experience network
problems after the maintenance window is complete or if you have any
other concerns.
[Read more…] about Schedule network maintenance during 2012 curtailment starting Dec 26th

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 6
  • Go to page 7
  • Go to page 8
  • Go to page 9
  • Go to page 10
  • Interim pages omitted …
  • Go to page 66
  • Go to Next Page »

Primary Sidebar

IRIS Service Status

Green
We have 0 Active Incidents, and 0 Scheduled Maintenances noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.
  • About
  • Contact
  • Privacy
  • Accessibility
  • Nondiscrimination

© 2022–2025 UC Regents  |  Log in