• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget
IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Networks
    • Networks Home
    • Campus Wi-Fi
    • EECS Wired Networks
    • Campus Wired Networks
    • FAQ: Network
    • VPN
    • EECS Firewall
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

Wired Networking

Wired network service

Network Maintenance for Cory 3rd floor

April 27, 2013 by Janet Shu

The switch on the 3rd floor of Cory will be rebooted around 8:00AM on April 27. You may experience some intermittent network issues during the scheduled time from 8:00-10:00AM.

Resolved as of 2013-04-27 09:43:00

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Partial loss of network on 3rd floor of Cory hall connected to AC failure

April 13, 2013 by IRIS Staff

Part of the wired & wireless network on the 3rd floor of Cory hall is down because of a switch that failed from overheating due to an AC unit failure. Contacting the vendor for replacement parts.
[Read more…] about Partial loss of network on 3rd floor of Cory hall connected to AC failure

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

10G connection for the new switch

April 6, 2013 by Janet Shu

We would bring up the 10G connection for the new installed switch that serves cory TI lab around 8:00am April 6, 2013. If you experience any issue after that, please report to help@eecs

Resolved as of 2013-04-06 08:50:00

Filed Under: Resolved Incidents Services: Wired Networking

ATT link for BWRC

March 2, 2013 by Janet Shu

ATT fiber link would be tested. This new link will be used by BWRC wireless center. This testing will start from 9:00AM-10:00AM on March 2 (Sat). BWRC users you might experience some intermittent network issues.

If you have any concern please contact networks@eecs
[Read more…] about ATT link for BWRC

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

ATT fiber link for BWRC

February 5, 2013 by Janet Shu

IST engineer would like to do the testing for the new ATT fiber link. This new link will be used by BWRC wireless center. This testing will start from 6:30-7:30AM on Feb 5(Tuesday).

If you have any concern please contact networks@eecs

Resolved as of 2013-02-05 07:30:00

Filed Under: Resolved Incidents Services: Wired Networking

Unexpected network flood

January 8, 2013 by IRIS Staff

There was an unexpected impact to the wired and wireless networks at approximately 4pm causing significant packet loss. IRIS staff has isolated the problem and is in the process of restoring impacted services. A configuration change by IT staff to the network was the enabler that allowed hosts from the server room to flood the network.

Resolved as of 2013-01-08 18:00:00

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Schedule network maintenance during 2012 curtailment starting Dec 26th

December 26, 2012 by IRIS Staff

We will perform network maintenance with expected brief outages on
Wednesday, December 26th. The changes and scheduled times are listed
below, however the times and durations are subject to change. When the
maintenance is complete we will post an update on IRIS News afterwards
will monitor email to help@eecs for network problem reports.

10am-11am, Cory Hall 2nd floor wired network migration
======================================================
Any activated port cables id that have not migrated from the 47 subnet
by Wednesday December 26, 2012 will be migrated then. Further
information is available at:
https://iris.eecs.berkeley.edu/news/7853-second-floor-cory-hall-iris

11am-12pm, BWRC campus link switched from Comcast to AT&T
=========================================================
The circuit that connects the Berkeley Wireless Reserach Center (BWRC)
will be switched from the current 100Mb Comcast link to a 1Gb AT&T
link. We expect the downtime will take less than 5 minutes, but have
scheduled an hour maintenance window for testing puroses and
unexpected problems (in the event of which we can switch back to the
Comcast link).

12pm-3pm, Firmware upgrade for EECS Wireless network
====================================================
New firmware will be applied to the EECS wireless network devices.
This will require a rolling reboot across all four wireless
controllers. You may experience wireless outages during this time,
however the wired network will be available.

Please report the issues to networks@eecs if you experience network
problems after the maintenance window is complete or if you have any
other concerns.
[Read more…] about Schedule network maintenance during 2012 curtailment starting Dec 26th

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

BWRC Wireless Networking is down

November 29, 2012 by Janet Shu

BWRC Wireless Networking is down
[Read more…] about BWRC Wireless Networking is down

Filed Under: Resolved Incidents Services: Wired Networking

Temporary campus power outage Nov 29

November 29, 2012 by Lars Rohrbach

IST reports that a number of campus buildings experienced a temporary power outage this morning, including Cory, Soda, and other College of Engineering buildings.

Staff are working to ensure that services are restored to normal.

Campus may post updates as more information is learned, at http://ucbsystems.org/
[Read more…] about Temporary campus power outage Nov 29

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

Unplanned network outage in part of the 3rd floor of Cory Hall due to switch failure

November 19, 2012 by IRIS Staff

Unplanned network outage in part of the 3rd floor of Cory Hall due to switch failure. Wired and wireless access is affected. We are working to restore access to wireless by moving to a different switch.

We have contacted the vendor for a replacement and will re-route wired connectivity if the outage on this device will be for an extended period of time.
[Read more…] about Unplanned network outage in part of the 3rd floor of Cory Hall due to switch failure

Filed Under: Resolved Incidents Services: Wired Networking, Wireless Networking

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 18
  • Go to page 19
  • Go to page 20
  • Go to page 21
  • Go to page 22
  • Interim pages omitted …
  • Go to page 29
  • Go to Next Page »

Primary Sidebar

IRIS Service Status

Green
We have 0 Active Incidents, and 0 Scheduled Maintenances noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.
  • About
  • Contact
  • Privacy
  • Accessibility
  • Nondiscrimination

© 2022–2026 UC Regents  |  Log in