• Skip to main content
  • Skip to primary navigation
  • Skip to primary sidebar
  • UC Berkeley
  • Berkeley Engineering
  • EECS
Header Search Widget
IRIS

Instructional & Research Information Systems

  • About Us
  • Get Started
  • Get Help
  • FAQ
    • FAQ: Accounts
    • FAQ: EECS Slack
    • FAQ: File Storage
    • FAQ: Hardware
    • FAQ: MacOS
    • FAQ: Mail
    • FAQ: Mailing Lists
    • FAQ: Network
    • FAQ: Security
    • FAQ: Unix
    • FAQ: Web
    • FAQ: Windows
  • Services
    • Accounts
    • Backups
    • E-mail
    • EECS Login Servers
    • File Storage
    • Infrastructure
    • Mailing Lists
    • Networks
    • Printing
    • Room Reservations
    • Security
    • Software
    • Unix
    • Web
  • Policies
  • Forms
    • System Registration/Update
    • Account Request Form
    • Project Storage Request
    • SSL Certificate Request
    • All Other Forms
  • Rates

Cory Hall partial power outage, Wednesday, April 29, 2026

April 9, 2026 by Lars Rohrbach

Campus Facilities Services is scheduled to perform an urgent repair, replacing the main circuit breaker serving Cory Hall’s 188 Lab and 1st floor Mezzanine. An email from Logan Baldini, our Director of Facilities and Capital Projects, already went out on April 8 to Cory Hall occupants.

Work will take place Thursday, April 16 Wednesday, April 29, 8:15pm — 11:15pm. Power will be shut down for most of the south and west side of Cory Hall, including stairwells. Detailed room breakdown is available via Google Doc, attached to the email sent out by Logan.

We do not expect to lose power to our network switches and routers in Cory Hall during this work. If we do have unexpected power loss to our network equipment, then access to services hosted in Cory Hall (e.g. any research or instructional servers in 165 Cory) will be affected; we will monitor our equipment, but would expect service to resume once the electrical work is completed.


UPDATE

[2026-04-14 | larsrohr ]

This work has been postponed by Campus Facilities Services. We will update or re-post when we have an revised schedule to report.


UPDATE

[2026-04-27 | larsrohr ]

A revised email from Logan went out today to announce rescheduling of this work, now for the evening of Wednesday, April 29.


UPDATE

[2026-04-29 | larsrohr ]

Resolved as of 2026-04-29 11pm

Filed Under: Resolved Incidents Services: Wired Networking

Primary Sidebar

IRIS Service Status

Yellow
We have 0 Active Incidents, and 1 Scheduled Maintenance noted.

IST Service Status

Outages to campus services are listed at berkeley.statusdashboard.com.
  • About
  • Contact
  • Privacy
  • Accessibility
  • Nondiscrimination

© 2022–2026 UC Regents  |  Log in